The Energy Pioneer
No Result
View All Result
  • Home
  • Clean Tech
  • Renewable Energy
  • Green Finance
    • Crash Course
    • Private Financing
    • Public Financing
    • Carbon Markets
  • Policy
  • Regions
    • Africa
    • Asia
    • West Asia
    • Latin America
    • North America
    • Europe
  • Features
  • Who We Are
    • About Us
    • Contact Us
    • EP Investing
  • Home
  • Clean Tech
  • Renewable Energy
  • Green Finance
    • Crash Course
    • Private Financing
    • Public Financing
    • Carbon Markets
  • Policy
  • Regions
    • Africa
    • Asia
    • West Asia
    • Latin America
    • North America
    • Europe
  • Features
  • Who We Are
    • About Us
    • Contact Us
    • EP Investing
No Result
View All Result
The Energy Pioneer
No Result
View All Result
  • Home
  • Clean Tech
  • Green Finance
  • Policy
  • Renewable Energy
  • Regions
  • Features
  • Who We Are
Home Africa

$4.2BN Power Play: Zambia and Zimbabwe Partner on Batoka Gorge Hydropower Project

byAndrew Mambondiyani
April 1, 2026
Reading Time: 5 mins read

The Zambezi River Authority’s Council of Ministers has approved a $220 million equity contribution from both the Zimbabwean and Zambian governments to kickstart a $4.2 billion Batoka Gorge Hydro-Electric project along the Zambezi River.

RELATED POSTS

Fighting Saltwater with Sunlight: How Solar Technology Is Tackling the Drinking Water Crisis in Southwest Bangladesh

88% Renewable, 100% Confused: Brazil’s Coal Problem

The Rockefeller Foundation’s Catalytic Capital: Turning Early Investments into Lasting Energy Impact

The Zambezi River Authority, which manages the Kariba Dam and the sustainable harnessing of the Zambezi River’s water resources, is governed by a Council of Ministers (COM) consisting of four members. Two are ministers in Zambia’s government, and two are ministers in Zimbabwe’s government.

Feasibility studies are underway, and a public-private partnership model is being explored to implement the Batoka Gorge Hydro-Electric Scheme (BGHES) project, which aims to boost energy production and reduce power shortages in both countries. The project involves constructing a 2,400 MW hydropower plant on the Zambezi River.

From the team behind The Energy Pioneer — EP Network is where the energy transition connects.

Explore →

Currently, Zambia and Zimbabwe are experiencing an electricity crisis, as the Kariba Dam, which generates most of the electricity for the two countries, is still recovering from a devastating 2024 El Niño-induced drought. Water levels in the dam remain too low to generate sufficient hydroelectricity for both countries.

The El Niño drought, the worst in over 4 decades, wiped out crops, killed millions of livestock, and reduced water levels in major dams and rivers in many countries in Southern Africa, resulting in some residential areas in Zimbabwe and Zambia going for more than 20 hours a day without electricity. Climate change droughts have become more frequent and devastating over the past two decades. Businesses in both countries have closed due to electricity shortages, with small businesses hit hardest. In Zimbabwe’s city of Mutare, the once bustling home industries have now gone quiet.

In a communiqué issued by the Zambezi River Authority Council of Ministers following its 43rd meeting on December 29, 2025, in Victoria Falls, Zimbabwe, the council noted progress on the energy project.

“Whilst COM noted the progress, it directed that the timelines for the implementation of the project be revised as agreed by the two Heads of State [Zimbabwe President Emmerson Mnangagwa and Zambian counterpart Hakainde Hichilema] at the Bi-National Commission meeting held in Zimbabwe in November 2025 with a view to accelerating the implementation of the project,” the Council of Ministers says in a statement.

Buy JNews
ADVERTISEMENT

The Council of Ministers reaffirmed its commitment to a public-private partnership model and approved a $220 million equity contribution from each government, including the exploration of equity partnerships to enhance bankability.

“This allocation will be for the BGHES dam construction for the budget cycle beginning 2026,” the Council of Ministers adds.

A resource mobilization committee, whose objective is to raise funds for the publicly owned dam infrastructure component of the project, will be led by the ministers responsible for finance in Zimbabwe and Zambia.

The proposed Batoka Gorge Hydro-Electric Scheme is located on the Zambezi River about 47 kilometers downstream of Victoria Falls. It was first conceived in 1972, following a comprehensive study commissioned by the predecessor of the Zambezi River Authority, the Central African Power Corporation. Over the past decades, the energy project has continued to evolve, incorporating modern engineering practices and sustainability considerations to ensure it meets the highest standards of efficiency and environmental stewardship.

However, Zimbabwe energy expert Eddie Cross remains skeptical about the viability and success of the Batoka Gorge Hydro-Electric project. Cross tells The Energy Pioneer that when the Batoka Gorge Hydro-Electric Scheme project was originally proposed, the cost of the dam and power plant was estimated at US$7 billion.

Cross is currently the chairman of Green Hybrid Power and the Intensive Energy Users Group, a consortium of mining and industrial firms spearheading the Kariba floating solar energy project.

“A Zambian investigation found substantial inflation of costs, and the project was cancelled. It is a poor site located in the gorge below the falls. It depends on river flow, and the amount of power generated will be dependent on river flow – peak in March and very low in October. This will make it expensive to operate,” says Cross, who is also a former legislator and advisor to the Reserve Bank of Zimbabwe.

Cross adds that in the lower Zambezi, Mozambique has several sites that are much more productive because the river flow is boosted by several rivers, such as Kafue, Luangwa, and Shiri, and the two major dams, Kariba and Cahora Bassa, regulate flow.

“These sites could generate up to 6000 megawatts at low costs and are a much better option,” he says.

Meanwhile, progress is being made on the Devils Gorge Hydro-Electric Scheme and the Kariba Floating Solar PV Project.

The Devils Gorge Hydro-Electric Scheme (DGHES), the Zambezi River Authority’s Council of Ministers says, is undergoing prefeasibility studies by Tractebel Engineering, which have delivered the inception report, environmental and social screening report, and options assessment report.

At the same time, progress continues on the Kariba Floating Solar PV Project, including the African Development Bank’s completion of consultant evaluations and the appointment of a joint-venture consortium to conduct feasibility studies. The 600 MW floating solar PV power plant on Lake Kariba will be implemented in three phases, starting with 150 MW in the second quarter of this year.

However, with millions of Zambians and Zimbabweans enduring prolonged electricity outages, the Batoka Gorge Hydro-Electric project offers hope to many. However, given the project’s high cost, it remains to be seen whether it will come to fruition; time will tell.

Finished the story? Meet the people behind it.

EP Network is where energy journalists, investors, companies, and clean energy leaders connect.

Join EP Network →
ShareTweetShare
Andrew Mambondiyani

Andrew Mambondiyani

Andrew Mambondiyani is a journalist based in Zimbabwe with bylines in local, regional, and international publications, including BBC, U.S. News and World Report, MIT Technology Review, Yale E360, The Telegraph, Al Jazeera, Mongabay, Vice, and The Daily Beast, among others. He has an interest in climate change, clean energy, agriculture, sustainable development, and the environment in general.

Related Posts

Fighting Saltwater with Sunlight: How Solar Technology Is Tackling the Drinking Water Crisis in Southwest Bangladesh
Solar

Fighting Saltwater with Sunlight: How Solar Technology Is Tackling the Drinking Water Crisis in Southwest Bangladesh

July 14, 2026
88% Renewable, 100% Confused: Brazil’s Coal Problem
Fossil Fuels

88% Renewable, 100% Confused: Brazil’s Coal Problem

July 13, 2026
The Rockefeller Foundation’s Catalytic Capital: Turning Early Investments into Lasting Energy Impact
Private Financing

The Rockefeller Foundation’s Catalytic Capital: Turning Early Investments into Lasting Energy Impact

July 10, 2026
How Javier Milei’s Cuts Are Reshaping Argentina’s Environmental Institutions
Policy

How Javier Milei’s Cuts Are Reshaping Argentina’s Environmental Institutions

July 9, 2026
The Power of Commitment: How Government Investment Accelerated Electrification in Tanzania
Public Financing

The Power of Commitment: How Government Investment Accelerated Electrification in Tanzania

July 8, 2026
Reforming Government Fossil Fuel Subsidies
Public Financing

Reforming Government Fossil Fuel Subsidies

July 6, 2026
Next Post
South Africa’s Exciting Clean Tech Startups

South Africa's Exciting Clean Tech Startups

A Crash Course in Climate Finance # 3

A Crash Course in Climate Finance # 3

Popular Stories

  • The Race to Host AI: Data Centres in Water-Scarce India

    The Race to Host AI: Data Centres in Water-Scarce India

    0 shares
    Share 0 Tweet 0
  • Vietnam’s Oil Buffer Faces Pressure as the Iran War Disrupts Global Oil Flows

    0 shares
    Share 0 Tweet 0
  • Caught Between India’s Military Ambitions and Green Promises: The Future of the Andaman and Nicobar Islands

    0 shares
    Share 0 Tweet 0
  • The Philippines’ Nuclear Gamble

    0 shares
    Share 0 Tweet 0
  • South Sudan’s Missed Opportunity: Untapped Renewables Leave Millions in the Dark

    0 shares
    Share 0 Tweet 0

Actionable Info

From The Energy Pioneer

Where the energy transition connects.

Journalists, investors, companies, and clean energy leaders — all in one network.

Explore EP Network →

The Energy Pioneer

The Energy Pioneer covers the global energy transition — from clean tech and green finance to policy and renewable energy.

Recent Posts

  • Fighting Saltwater with Sunlight: How Solar Technology Is Tackling the Drinking Water Crisis in Southwest Bangladesh
  • 88% Renewable, 100% Confused: Brazil’s Coal Problem
  • The Rockefeller Foundation’s Catalytic Capital: Turning Early Investments into Lasting Energy Impact

Quick Links

  • Home
  • Clean Tech
  • Renewable Energy
  • Green Finance
  • Policy
  • Regions
  • Features
  • Who We Are

© 2026 The Energy Pioneer | All Rights Reserved. |

From The Energy Pioneer

You read about the energy transition. EP Network connects you to it.

Join the network of journalists, investors, companies, and professionals building the clean energy future.

No thanks
Please enter a valid email.
You're in. We'll be in touch soon.
No Result
View All Result
  • Home
  • Clean Tech
    • Electric Vehicles
    • Energy Efficiency
    • Green Hydrogen
    • Smart Grid
    • Battery Storage
  • Green Finance
    • Public Financing
    • Private Financing
    • Carbon Markets
  • Policy
  • Renewable Energy
    • Wind
    • Solar
    • Hydropower
    • Nuclear
    • Hydrogen
    • Fossil Fuels
    • Geothermal
  • Regions
    • Africa
    • Asia
    • Europe
    • North America
    • Latin America
    • West Asia
  • Features
  • Who We Are
    • About Us
    • EP Investing
    • Contact Us

© 2026 The Energy Pioneer | All Rights Reserved. |